How to plan signage for new premises the right way

Inspiration
From the world of advertising
November 3, 2026

Opening new premises? Follow 5 steps to make sure your signage is ready on time, without needless complications or overpaying.

Signage gets left until the last minute. Almost always. And almost always it costs dearly: either you overpay for express production, or you open with a half-empty façade. Here is how to avoid that.

Step 1: Find out what you are allowed to do

Before you design or order anything, find out the conditions:

  • Consent from the property owner. In the vast majority of cases it is required. Without it, you cannot apply for a permit.
  • A building or advertising permit. This depends on the municipality and on the size and placement of the element. Small installations are exempt, larger ones are not.
  • Heritage protection. If the building or site is in a conservation area, the conditions are considerably stricter.

You do not have to find your way through all this yourself. An experienced manufacturer knows the legislation and will obtain the permits for you. Just let them know in good time what you are planning.

Step 2: Where do your customers come from?

Think about how your customers move:

  • On foot from the street: façade signage, shop window, illuminated fascia sign
  • By car from the main road: pylon, totem, large-format graphics
  • Customers inside the building: wayfinding, door signs, information boards

Survey the location by day and by night. The picture is often different.

Step 3: Have a professional prepare the design

A professional contractor does not turn up with a catalogue. They come to the site, survey the façade, understand your brand identity and design a solution that fits the location, the legislation and your budget. A good design includes day and night visualizations, a technical drawing for the permit, a materials specification and a realistic schedule.

Step 4: Allow for realistic timescales

Producing a signage system takes weeks, not days. The schedule must include preparing and approving the design, obtaining permits (which can take several weeks), the production itself and installation. Technical matters, such as the need for a work platform or scaffolding, are handled by the manufacturer. A good contractor will tell you about them, together with the deadlines, in the quotation.

Step 5: Think about rebranding

If you are planning more branches or know your branding will change within 2–3 years, say so straight away. Modular systems let you replace the logo cabinet without dismantling the entire installation. It is an extra investment, but it pays for itself many times over when you rebrand.

We take care of most of this for you: from the site survey and design through permits and production to installation. We will tell you in the quotation what needs to be arranged on your side.

[banner:nova-provozovna-maly]

You might also like:

Inspiration
1.7.2025

3D signs: how to attract customers’ attention

An illuminated 3D sign has a remarkable ability to draw attention and leave a lasting impression. In this article, we explain why illuminated 3D signs are such a good choice and how they can help you stand out from the competition.

Inspiration
From the world of advertising
13.10.2026

Advertising pylons and totems: when the investment pays off (and when it doesn't)

Advertising pylon or totem: when does the investment pay off, and when not? A guide for businesses that want their premises seen from the main road.